PAST PROJECT


June 7, 2008

Project: Home Makeover Phase IV

Project Participants: Brian Andrews, Val Clewley, Babs Gearheart, and Eric Stewart.

Bathroom tile
Eric installs the new tile on the bathroom floor.

Door frame finished
Bathroom doorframe widening with new molding has been finished.

Pocket door final paint          Pocket door final paint
Babs and Brian put the finishing touches on the pocket door
.

Pocket door finished          Pocket door finished
This pocket door, combined with the widened bathroom doorframe, will enable complete wheelchair access.

Living room wall finished
Completed living room wall.

Kitchen tile finished
Completed kitchen tile floor.

House back finished
Completed dry rot repair and paint job on the back of the house.

House front finished
Completed front yard leveling/gravel spreading and house paint jobs.